For 10 years we have been working on Spa projects worldwide and
have completed unique and successful facilities.
Development and construction on the terms of general contractor of the
spa & wellness center “Globino” (over 1.200 m²) with swimming pool 25 m along with pools with salt and cold water;
Design and development of the spa center with indoor and outdoor pools for
Medical Wellness Resort Ureki with the total area over the 7 ha located at the Black sea coast of Georgia;